Dunlop Howick – Phase 2 • Industrial • 2.78 MWp

Dunlop Howick – Phase 2 • Industrial • 2.78 MWp

Designed the expansion of an existing 2.78 MWp industrial energy system, strategically utilising available roof space and existing electrical infrastructure to maximise performance. The project is ongoing and is focused on scalable electrical design, efficient project delivery, and long-term energy resilience for the facility.

 Year: 2027
 Status: In Progress
Snackworks • Industrial • 1.14 MWp

Snackworks • Industrial • 1.14 MWp

Designed and currently delivering the electrical solution for a 1.14 MWp industrial energy system to reduce operational energy costs across the manufacturing facility. The system incorporates seven Sigenergy inverters distributed across two LV tie-in points, with MV metering used to optimise generation against the plant's total electrical demand. The design focused on intelligent system integration, load matching, and reliable project delivery while providing a scalable platform for future energy management and storage solutions.

 Year: 2027
 Status: In Progress
The Galileo • Residential • 219.4 kWp

The Galileo • Residential • 219.4 kWp

Designed a 219.4 kWp hybrid energy system centred around Sigenergy hybrid inverters and Battery Energy Storage Systems (BESS). The solution enables load shifting, peak demand reduction, and improved energy resilience while reducing reliance on the electrical grid.

 Year: 2026
 Status: Completed
The Enigma • Residential • 290 kWp

The Enigma • Residential • 290 kWp

Engineered a 290 kWp energy system to reduce daytime electricity consumption while making strategic use of the site's existing electrical infrastructure. The design supports future BESS integration and provides a scalable platform for additional capacity as energy demands increase.

 Year: 2026
 Status: Completed
Dunlop Howick – Phase 1 • Industrial • 1.30 MWp

Dunlop Howick – Phase 1 • Industrial • 1.30 MWp

Led the electrical design and technical delivery of a 1.30 MWp industrial energy system, optimising inverter configuration, electrical reticulation, and network integration to significantly reduce operational energy costs while preparing the facility for future expansion.

 Year: 2025
 Status: Completed
Weir Minerals Alrode • Industrial • 425.9 kWp

Weir Minerals Alrode • Industrial • 425.9 kWp

Delivered the electrical design for a 425.9 kWp industrial energy system tailored to the facility's operational load profile. The project focused on reducing energy costs through efficient system integration, reliable electrical infrastructure, and a design that supports future battery storage integration.

 Year: 2025
 Status: Completed
Milpark Mews • Residential • 212.4 kWp

Milpark Mews • Residential • 212.4 kWp

Designed and delivered a 212.4 kWp grid-connected energy system for a multi-residential development to reduce operational energy costs. The electrical design focused on optimising inverter placement, cable routing, and integration with the existing reticulation network while providing a scalable foundation for future Battery Energy Storage System (BESS) integration.

 Year: 2025
 Status: Completed
The Eclipse • Residential • 361.5 kWp

The Eclipse • Residential • 361.5 kWp

Engineered a 361.5 kWp energy system that seamlessly integrated with the site's existing electrical infrastructure. The design prioritised efficient load matching, reduced electricity costs, and incorporated provisions for future BESS deployment and system expansion without major network modifications.

 Year: 2025
 Status: Completed
The Encore • Residential • 348.7 kWp

The Encore • Residential • 348.7 kWp

Delivered the electrical design for a 348.7 kWp residential energy system, optimising network integration and inverter configuration to maximise energy utilisation. The project was designed with future electrical infrastructure upgrades and battery storage expansion in mind, ensuring long-term flexibility.

 Year: 2025
 Status: Completed
Grinding Techniques • Industrial • 716.0 kWp

Grinding Techniques • Industrial • 716.0 kWp

Engineered a 716.0 kWp industrial energy system designed to offset significant daytime energy demand while integrating seamlessly with the site's electrical network. The project emphasised scalable electrical design, operational reliability, and efficient project delivery.

 Year: 2025
 Status: Completed
The Alpha • Mixed-Use Development • 301.4 kWp

The Alpha • Mixed-Use Development • 301.4 kWp

Designed a 301.4 kWp energy system to support both residential and commercial loads, balancing diverse demand profiles through careful electrical system design. The project focused on efficient power distribution, network integration, and reliable long-term operation.

 Year: 2024
 Status: Completed
BMW Bedfordview • Commercial & Retail • 140.7 kWp

BMW Bedfordview • Commercial & Retail • 140.7 kWp

Designed and delivered a 140.7 kWp commercial energy system that maximised available roof space and integrated with the dealership's existing electrical network. The solution reduces electricity costs through on-site generation while maintaining reliable operation and allowing for future system enhancements.

 Year: 2024
 Status: Completed